Guide · 5 minute read

What the ACA guide asks subcontractors for, and what to have ready

The short version

In September 2025 the Australian Constructors Association (ACA), the body for the country's largest builders, published a guide for subcontractors and suppliers on emissions reporting. It says what a head contractor may ask you for, and it includes a clause a head contractor can put in your subcontract.

If you fabricate steel, pour concrete, run plant or cart materials for a large builder, this is the document the request will be based on when it arrives.

What it says a head contractor can ask for

The guide says a head contractor “may require” certain information from a subcontractor or supplier “in the normal course of procurement and project delivery”. For a subcontractor that means the energy used on the job, such as diesel and gas, the products that go into it, and plant details like engine capacity and fleet age. For a supplier it adds the emissions from making the product it sells to the job.

That puts emissions data alongside the insurance certificates and safety paperwork you already hand over as a condition of the job.

The clause

The guide includes a template subcontract clause for reporting energy, materials and waste by a set day each month.

A figure once a year can be pulled together in a bad week in July. A figure every month needs somewhere for the bills to land as they come in.

Tenders

The guide also describes where it expects tendering to go, with emissions schedules in the tender documents and a carbon budget used alongside price to choose subcontractors. That puts the number in front of the estimator as well as whoever looks after compliance.

Where subcontractors are now

A survey the guide cites found that only about half of subcontractors and suppliers are actively tracking their emissions, and 6% consistently report across all three scopes.

So if the clause lands on your desk and you have nothing, you're far from alone.

What to have ready

You can start with the records you already have, kept by month.

  • Fuel. Litres of diesel and petrol by month, from fuel card statements or bulk delivery invoices. Keep vehicles and site plant apart if you can, because they use different factors: 2.72 kg CO2-e a litre for diesel burned in a vehicle, 2.71 for stationary plant.
  • Electricity. Kilowatt-hours for every site, from the bills. You need the kWh figure rather than the dollar amount.
  • Gas. The same, in megajoules or gigajoules, from the bills.
  • Materials. Quantities, not dollars, where you can get them: tonnes of steel, cubic metres of concrete. Delivery dockets and supplier invoices usually carry them.
  • Waste. Tonnes to landfill and tonnes recycled, from your waste contractor's invoices or reports.

If the bills live in three inboxes and a filing cabinet, start there. A shared folder with one sub-folder a month is enough.

What the guide doesn't say

It doesn't say every head contractor will ask, or when. The word is “may”. We haven't seen a list of which builders have adopted the clause, and we won't guess at one.

Where CarbonCut fits, and where it doesn't

CarbonCut takes your fuel, electricity, gas and waste bills and works out a scope 1, 2 and 3 baseline on the Australian Government's National Greenhouse Accounts factors. Every number on the report shows the factor, its source and which year's edition it is, so the person checking it can follow the working.

It has two limits. It doesn't fill in a head contractor's template for you, though it gives you the figures and the evidence to put in it. And purchased materials are a spend-based estimate, labelled as one, until you have quantities to replace it.

You can try it on a couple of your own bills before paying anything.

Source: Australian Constructors Association, Subcontractors and Suppliers Emissions Reporting Guide (September 2025), pages 6 to 13. The survey is Fulton Hogan's Supply Chain Decarbonisation Survey, November 2024. Checked 9 November 2026.

What the ACA guide asks subcontractors for, and what to have ready